Conveyor Belt 150 ton/h

← Back to Projects
Group Pronave – Pronave Pool Industrial
Conveyor Belt 150 ton/h
  • Client: Pronave Group
  • Location: São José dos Campos, SP
  • Period: 2020 (2 months)
  • Category: INDUSTRIAL / TURN-KEY
Contact Us
 
 
  CONTEXT After the ETM renovation, Pronave Group entrusted a new project: a conveyor belt to transport 150 ton/h of soda ash. THE PROPOSAL: TURN-KEY (EPC) "We do it all: project, manufacturing, installation, commissioning." EPC SCOPE E - Engineering:
  • Conceptual and basic design
  • Sizing (capacity, power)
  • Detailed engineering
  • Calculation report and ART
P - Procurement:
  • Material acquisition
  • Supplier management
C - Construction:
  • Structure manufacturing
  • Installation
  • Commissioning
DEVELOPMENT
  1. Technical visit (survey)
  2. Conceptual design
  3. Detailed engineering (calculations, drawings)
  4. Manufacturing (metal structure, component integration)
  5. Field installation
  6. Testing and training
RESULTS ✅ 2 months from start to operation ✅ System working perfectly ✅ 150 ton/h confirmed ✅ Zero accidents ✅ Still operational (2020-2025) ✅ EPC capacity proof IMPACT This project proved complete engineering capacity, opening doors for POSH Arcadia EAS 2025 projects with structural project development. DATA
  • Type: Turn-Key (EPC)
  • Capacity: 150 ton/h
  • Length: ~15 meters
  • Duration: 2 months
  • Status: Operating (2020-2025)

Your project demands absolute reliability. Engport delivers.

Certified team (ISO 9001, IRATA, AWS), a track record of 150+ delivered projects, and the ability to operate in critical environments with Zero Downtime. If you are looking for a flawless, on-time, fully traceable solution, talk to our engineering team.

Talk to Us