Extended shutdown - POSH Arcadia - EAS

← Back to Projects
POSH Arcadia Em alto-mar
Extended shutdown - POSH Arcadia - EAS
  • Client: POSH Arcadia
  • Location: EAS Recife, PE
  • Period: 2025 (90 days)
  • Category: OFFSHORE
Contact Us

This shutdown represents the pinnacle of trust gained with POSH. It was not just maintenance - it was a complete turn-key engineering project, where we took full responsibility from developing complex structural projects to manufacturing, installation, and commissioning.

ENGINEERING PROJECTS DEVELOPED
Customized Metal Structures:

  • Platform for gangway cone maintenance
  • Access walkways to the vents
  • Multiple structures on demand
  • Calculation report and Technical Responsibility Acknowledgment (ART)

MANUFACTURING AND INSTALLATION

  • 15+ tons of manufactured metal structures
  • Transported over 3,000 km
  • Installation and commissioning

MAINTENANCE SCOPE

  • Complete helideck
  • Chimneys with mechanical treatment
  • Davit systems for lifeboats
  • IRATA throughout the platform
  • Boilermaking and general mechanics

RESULTS

✅ 90 days rigorously fulfilled
✅ All projects approved in the first reviews
✅ Zero accidents
✅ Established a new level of technical capacity

DATA

  • Team: 40+ professionals
  • Duration: 90 days (13 weeks)
  • Manufactured structures: 15+ tons
  • Developed projects: 4 complete with ART
  • Welds: 400+ linear meters

Your project demands absolute reliability. Engport delivers.

Certified team (ISO 9001, IRATA, AWS), a track record of 150+ delivered projects, and the ability to operate in critical environments with Zero Downtime. If you are looking for a flawless, on-time, fully traceable solution, talk to our engineering team.

Talk to Us