- Client: POSH Arcadia
- Location: EAS Recife, PE
- Period: 2025 (90 days)
- Category: OFFSHORE
This shutdown represents the pinnacle of trust gained with POSH. It was not just maintenance - it was a complete turn-key engineering project, where we took full responsibility from developing complex structural projects to manufacturing, installation, and commissioning.
ENGINEERING PROJECTS DEVELOPED
Customized Metal Structures:
- Platform for gangway cone maintenance
- Access walkways to the vents
- Multiple structures on demand
- Calculation report and Technical Responsibility Acknowledgment (ART)
MANUFACTURING AND INSTALLATION
- 15+ tons of manufactured metal structures
- Transported over 3,000 km
- Installation and commissioning
MAINTENANCE SCOPE
- Complete helideck
- Chimneys with mechanical treatment
- Davit systems for lifeboats
- IRATA throughout the platform
- Boilermaking and general mechanics
RESULTS
✅ 90 days rigorously fulfilled
✅ All projects approved in the first reviews
✅ Zero accidents
✅ Established a new level of technical capacity
DATA
- Team: 40+ professionals
- Duration: 90 days (13 weeks)
- Manufactured structures: 15+ tons
- Developed projects: 4 complete with ART
- Welds: 400+ linear meters