Multi-Site Boiler Making - Subsea7

← Back to Projects
Subsea7 from Brazil Em alto-mar
Multi-Site Boiler Making - Subsea7
  • Client: Subsea7
  • Location: SP, RJ, ES (5 states)
  • Period: 2010-2014 (4 years)
  • Category: OFFSHORE
Contact Us
 
 
 
 
 
 
 
  HISTORICAL CONTEXT: Executed by Tecnoporto (predecessor company), of which the current director of Engport was a partner. Expertise and methodologies are the foundation of the Engport Group.   THE OFFSHORE BOOM 2010-2014: golden era of Brazilian oil. Subsea7 expanded aggressively and found Tecnoporto as a local partner.   SCALE CHALLENGE Simultaneously managing:
  • 100+ employees
  • 3 states (SP, RJ, ES)
  • Multiple critical projects
  FLAGSHIP PROJECTS
  • Lula North and South Buoy Systems
  • Sapinhoá Buoy System
  • Overdrum Project
  • Seven Oceans Vessel
  SOLUTION: ORGANIZATIONAL STRUCTURE Hiring and developing supervisors - 1 for every 8-10 professionals. This structure is still used today at Engport.   LEGACY Although Tecnoporto closed during the Lava Jato crisis (2014), the experience was fully transferred to the Engport Group (founded 2020).   DATA
  • Employees (peak): 100+
  • Duration: 4 years
  • States: 3
  • Main projects: Lula North/South, Sapinhoá, Overdrum

Your project demands absolute reliability. Engport delivers.

Certified team (ISO 9001, IRATA, AWS), a track record of 150+ delivered projects, and the ability to operate in critical environments with Zero Downtime. If you are looking for a flawless, on-time, fully traceable solution, talk to our engineering team.

Talk to Us